Design/Production

Production Control System

Engineering Department

1. Engineering Department employees

35 mechanical design engineers and 15 electric control design engineers

2. CADs used

AutoCAD (Mechanical, Inventor, etc.)
I-CAD
E-CAD

Processing Department (Kozawa Factory)

1. 35 machining engineers

2. major facilities

 

5面加工機
Five-face machine
(RB-7VM by Shin Nippon Koki Co., Ltd., table size 3.5m x 10m)

マシニングセンタMachining center
(MCC2013 by Makino Milling Machine Co., Ltd.)

 

 

Five face machines
Five face machines
(front: MVR40 by Mitsubishi Heavy Industries, Ltd., back: MVR30 by Mitsubishi Heavy Industries, Ltd.)

Constant Temperature Room
Constant Temperature Room (23℃, humidity 60%)

List of major facilities

Facility Number of units Facility Number of units
Five-face machine 5 Laser cutter 1
Machining center 9 Brake press 2
NC lathe 7 Shearing 1
General-purpose lathe 4 Face lathe 1
Punching machine 1 Cylindrical grinding machine 1
Radial drilling machine 2 Wire electric discharge machine 1
Surface grinding machine 2 MIG/MAG welder 3
Argon gas arc welding machine 6

Workers with qualifications

Skill qualification Number of workers
Grade 1 engine lathe operation 3
Grade 2 engine lathe operation 1
Grade 2 electric discharge machining 1
Grade 1 metal machining 1
Grade 2 metal machining 2
MIG/MAG welding compatibility verification 3
Stainless steel welding compatibility verification 4
Aluminum welding compatibility verification 2

Receiving/Inspection Department

3DRACK

Three-dimensional measuring machine    Movable rack for parts storage
(CRYSTA-APEX C9208 by Mitsutoyo Corp.)

Assembly Department

1. 37 assembly engineers

2. Assembly factory (A - H buildings, total area: 15,875m2)

3. Cleanroom (F building, class 100,000)

factoryl