Engineering Department
1. Engineering Department employees
35 mechanical design engineers and 15 electric control design engineers
2. CADs used
AutoCAD (Mechanical, Inventor, etc.) |
I-CAD |
E-CAD |
Processing Department (Kozawa Factory)
1. 35 machining engineers
2. major facilities
|
Machining center |
Five face machines
(front: MVR40 by Mitsubishi Heavy Industries, Ltd., back: MVR30 by Mitsubishi Heavy Industries, Ltd.)
Constant Temperature Room (23℃, humidity 60%)
List of major facilities
|
Workers with qualifications
|
Receiving/Inspection Department
Three-dimensional measuring machine Movable rack for parts storage
(CRYSTA-APEX C9208 by Mitsutoyo Corp.)
Assembly Department
1. 37 assembly engineers
2. Assembly factory (A - H buildings, total area: 15,875m2)
3. Cleanroom (F building, class 100,000)